1Move Street Workout Full Manual - Halaman 4

Jelajahi secara online atau unduh pdf Manual untuk Peralatan Kebugaran 1Move Street Workout Full. 1Move Street Workout Full 7 halaman.

7
8
SEMI-DRY
CONCRETE
C20/25
9
10
SET FOUR POLES VERTICALLY
INDICATED
ON A PICTURE No. 7
PUT ON ONE HORIZONTAL
LADDER ON THE POLES AND
FIX ITS CLAMPS ON THE
SCREWS USING THE TOOLS,
BUT DO NOT TIGHTEN.
USE SEMI-DRY CONCRETE
CLASS MIN. C20/25
TO FILL THE HOLES AND
CREATE FOOTING IN
DIMENSION 50x50x50 CM.
TOP OF THE CONCRETE
FOOTING SHAPE INTO A CONE.
LET IT DRY FOR NEXT 24H.
ON THE NEXT DAY TIGHTEN
THE SCREWS TO THE
MAXIMUM.
4