Drazice OKC 160 NTR / BP Panduan Pengoperasian dan Pemasangan - Halaman 19

Jelajahi secara online atau unduh pdf Panduan Pengoperasian dan Pemasangan untuk Ketel uap Drazice OKC 160 NTR / BP. Drazice OKC 160 NTR / BP 20 halaman. Stationary water heaters
Juga untuk Drazice OKC 160 NTR / BP: Panduan Pengoperasian dan Pemasangan (17 halaman), Panduan Pengoperasian dan Pemasangan (12 halaman), Panduan Pengoperasian dan Pemasangan (20 halaman), Panduan Pengoperasian dan Pemasangan (18 halaman), Panduan Pengoperasian dan Instalasi (20 halaman), Panduan Pengoperasian dan Pemasangan (18 halaman), Panduan Pengoperasian dan Instalasi (13 halaman)

Drazice OKC 160 NTR / BP Panduan Pengoperasian dan Pemasangan

4 IMPORTANT NOTICES

4.1 INSTALLATION REGULATIONS

Without a confirmation of performed electrical installation issued by an authorised company, the
-
warranty certificate shall be void.
Check and exchange the Mg anode regularly.
-
You have to apply for approval of a local power supplier to connect the appliance.
-
No stop valves can be put between the appliance and the safety valve.
-
If the overpressure in the water main exceeds 0.48 MPa, a pressure control valve must be mounted
-
before the safety valve.
All hot water outputs must have a combination faucet.
-
Before filling the appliance with water for the first time, it is recommended to fasten the flange
-
connection nuts of the tank.
It is not allowed to handle the thermostat, aside from temperature resetting with a control button.
-
All electric installation handling, adjustment and replacement of the regulation elements shall only
-
be performed by an authorised service company.
The thermal fuse must not be turned off! In case of thermostat defect, the thermal fuse interrupts
-
electric power input to the heating element if the water temperature in the appliance exceeds
90°C.
As an exception, the thermal fuse may also switch off due to water overheating caused by
-
overheating the hot water heating system boiler (in case of a storage tank).
We recommend you operate the appliance with one type of energy.
-
Both the electric and water installation must follow and meet the requirements and
regulations relevant in the country of use!
4.2 DISPOSAL OF PACKAGING MATERIAL AND FUNCTIONLESS
PRODUCT
A service fee for providing return and recovery of packaging material has
been paid for the packaging in which the appliance was delivered. The service
fee was paid pursuant to Act No 477/2001 Coll., as amended, at EKO-KOM
a.s. The client number of the company is F06020274. Take the water boiler
packages to a waste disposal place determined by the town. When the
operation terminates, disassemble and transport the discarded and
unserviceable appliance to a waste recycling centre (collecting yard), or
contact the manufacturer.
- 19 -