12.

SPARE PARTS

- Flange lid
- thermostat and thermal fuse
- control lights with wires
When ordering spare parts, give part name, type, and type number from the heater label.
13.

HEATER CLEANING AND ANODE ROD EXCHANGE

Repetitive water heating causes limestone sediment on both the enamelled tank walls and chiefly the flange lid. The
sedimentation depends on the hardness of water heated, its temperature, and amount of hot water consumed.
We recommend checking and cleaning the tank from scale and eventual replacement of the anode rod after
two years of operation. The anode life is theoretically calculated for two years of operation; however, it changes
with water hardness and chemical composition in the place of use. Based on such an inspection, the next term of
anode rod exchange may be determined. Have the company in charge of service affairs clean and exchange the
anode. When discharging water from the heater, the mixing valve of the hot water tap must be open in order to
avoid creating underpressure that would prevent water discharge.
14.

INSTALLATION REGULATIONS

Regulations and instructions that must be obeyed during heater assembly:
a) to the heating system
ČSN 06 0310 – Thermal systems in buildings – Designing and Installation
ČSN 06 0830 – Thermal systems in buildings – Protecting devices
b) to the electrical network
ČSN 33 2180 - Connecting of electric devices and appliances
ČSN 33 2000-4-41 - Low voltage electric installations Protective measures to ensure safety – Protection against
electric shock
ČSN 33 2000-7-701 - Low voltage electric installations Single-purpose devices and devices in special premises -
Premises with tub or shower to hot service water heating system
c) to the hot service water heating system
ČSN 06 0320 - Thermal systems in buildings - Hot water preparation – Design and Project Engineering
ČSN 06 0830 – Thermal systems in buildings – Protecting devices
ČSN 73 6660 – Internal water mains
ČSN 07 7401 - Water and steam for thermal energy equipments with working steam pressure up to 8 MPa
ČSN 06 1010 - Tank water heaters with water and steam heating; and combined with electric heating
Technical requirements. Testing.
ČSN EN 12897 – Water supply – Indirectly heated closed tank-type water heaters
Both the electric and water installation must follow and meet the requirements and regulations relevant in the
country of use.
Disposal of packaging material and functionless product
A service fee for providing return and recovery of packaging material has been paid for
the packaging in which the water heater was delivered.
The service fee was paid pursuant to Act No. 477/2001 Coll., as amended, at
EKO-KOM a.s. The client number of the company is F06020274. Take the water
boiler packages to a waste disposal place determined by the town. When the
operation terminates, disassemble and transport the discarded and unserviceable
heater to a waste recycling centre (collecting yard), or contact the manufacturer.
- flange lid seal
- Magnesium anode
- capillary thermometer
13
- insulation flange lid
- control button for the thermostat
- set of M12 (or M10) bolts