Anchor Navi-Trac Panduan Pengguna - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Tenda Anchor Navi-Trac. Anchor Navi-Trac 16 halaman. Tent jack
Juga untuk Anchor Navi-Trac: Panduan Pengguna (18 halaman), Petunjuk Perakitan (3 halaman)

SECURING THE 2nd BEAM WITH
DROP-IN RIDGE/EAVE BARS
DROP ONE HOOK END OF
BAR INTO EAVE FITTING.
INSTALLING PURLINS AND RIDGE BARS
USE SAME TECHNIQUE AS ABOVE AND
THE LONG LIFTING POLE WITH CRADLE
TO INSTALL THE PURLINS AND RIDGE
EAVE BAR (AT THE PEAK)
COMPLETING THE 1ST BAY
REMOVE CROSS-CABLE FROM 2ND BEAM
DROP-IN RIDGE/EAVE BARS
CONNECT 1st AND 2nd BEAMS.
USE LIFTING CRADLES TO
POSITION 2nd END.
IN 20' MID BAYS ONLY, INSTALL A SUPPORT PURLIN
BETWEEN THE EAVE AND THE PURLIN AT THE MID-RAFTER
LOCATION. THIS SUPPORT WILL BRACE AGAINST INWARD
DEFLECTION OF THE EAVE BAY THAT COULD OTHERWISE
RESULT IN WATER PONDING IN THE 20 FT BAY.
11