Carmanah R820-G Manual - Halaman 10

Jelajahi secara online atau unduh pdf Manual untuk Radar Carmanah R820-G. Carmanah R820-G 11 halaman. Cabinet-based systems
Juga untuk Carmanah R820-G: Panduan Memulai Cepat (16 halaman), Manual Penggantian Sistem Manajemen Energi (12 halaman), Manual Penggantian Pintu Kabinet (10 halaman), Manual (9 halaman), Manual (10 halaman), Instal Manual (14 halaman), Manual (10 halaman), Manual (10 halaman)

Carmanah R820-G Manual
6. Test system and ensure it is operating as prior to the retrofit.
a. Ensure the solar voltage (solr) is between 15-20V.
b. Run the BIST (built-in self-test) and verify there are no errors, in particular the charging error
(4000).
c. Let the system charge for a few minutes and confirm battery voltage rises under the battery (batt)
status. For 24/7 beacon systems you may need to temporarily change the input (inpt) to NO
(normally open) so the system isn't under a constant power draw
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
AC TO SOLAR RETROFIT GUIDE
|
carmanah.com
10