CommScope 864 FDH RESKIN KIT Panduan Petunjuk Instalasi - Halaman 4
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Peralatan Industri CommScope 864 FDH RESKIN KIT. CommScope 864 FDH RESKIN KIT 9 halaman.
5.6
Remove swing frame stops from cabinet shell. (2 Pictures)
Upper Rear Swing Frame Stops
5.7
Remove bolts from base of cabinet shell. There are 4 bolts under the RHS swing frame and 4 bolts under the LHS
swing frame.
Cabinet Shell Bolt Removal
5.8
Remove the screws holding the central post to the FDH shell. (2 Pictures)
Top Center Post Hardware Removal
Page 4 of 9
© 2021 CommScope, Inc. All Rights Reserved
Lower Swing Frame Door Stop
Bottom Center Post Hardware Removal