Dreamline SHEN-1332460 Series Panduan Petunjuk Instalasi - Halaman 15

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Kabin Mandi Dreamline SHEN-1332460 Series. Dreamline SHEN-1332460 Series 18 halaman. Quatra lux shower enclosure

12.
After final adjustment is complete, secure both lites of the Stationary Glass to the threshold.
Assemble the Bottom Brackets (#15) onto the bottom of the Stationary Glass, using the gaskets to
prevent glass to metal contact.
*Drill the holes into the Shower base through the holes in the flange of the Bottom Brackets (#15)
using an Ø1/8" drill bit for an acrylic base (or a Ø3/16" drill bit up to the stud, and an Ø1/8" bit to
drill a pilot hole into the stud for installation into a tile threshold). Fasten the bottom brackets with
the Pan Head Screws ST4.2×25 (#08) and washers. Cover the screw and washer with the Decorative
Covers (#10). (Fig 12)
1
13.
Make sure the area is clean and free of debris,
then apply a good quality mildew–resistant silicone
along the connection of the stationary glass with the
walls and the threshold. (Fig 13)
Allow 24 hours for the silicone
!
to fully cure before first use.
QUATRA LUX 32x46 34x46 shower enclosure manual Ver 3 Rev 4a 112019
3*
2
inside
Ø1/8" or Ø3/16"
4
Fig 12
100%
silicone
5
inside
24
Hours
Fig 13
14