ABSCO SHEDS CPSN2 Manual - Halaman 12

Jelajahi secara online atau unduh pdf Manual untuk Tenda ABSCO SHEDS CPSN2. ABSCO SHEDS CPSN2 19 halaman. Skillion carport

ATTACHING LEGS AND ERECTING
NOTE: Minimum two people required for these
step.
REAR POSTS
Referring back to page 9 locate one M10 x 20
mm bolt and a nut with washers both sides at
each end of the cross beam and post assembly
to the predrilled pivot holes.
Only finger tighten these for now to allow the
sections to move when lifted.
With one person holding each post begin to
carefully lift the roof structure.
Continue lifting until a second bolt can be
fastened to the top bracket and edge beam.
Secure all four M10 x 20mm bolts with a nut and
washer both sides.
Absco Industries
Assembly Instruction Manual
ABSCO SKILLION CARPORT
MODEL: CPSN2
3.00mW x 5.50mD x 2.37mH
FRONT POSTS
Repeat these steps for the other cross beam
assembly.
Now go around and full tighten all nut and bolt
connections, including splice plate connections.
Take care to check the bolts securing the base
brackets, as access can now be awkward.
ANCHOR
Using the dimensions on the front page secure
the frame to the concrete slab with the 50mm
dynabolts provided.
Model: CPSN2
24/11/22
12