Dromone Multi-Lock Quick Coupler Panduan Pemilik - Halaman 15
Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Ekskavator Dromone Multi-Lock Quick Coupler. Dromone Multi-Lock Quick Coupler 18 halaman. Excavator automatic quick coupler
Maintenance Schedule
The table below is to be used as a guideline in the maintenance program of the
coupler. The maintenance log should be update and signed off at the recommended
hourly interval. If parts are damaged or worn outside of the schedule below these
Description
Latching Hook Assy (Ref 1)
Signed
Date
Bucket Pins (Ref 4 and 5)
Signed
Date
Hydraulic Cylinder ~Lg (Ref 12)
Signed
Date
Hydraulic Cylinder ~S (Ref 11)
Signed
Date
Front lock (Ref 7)
Signed
Date
Cylinder Pin (Ref 6)
Signed
Date
Hook Assy Pin (Ref 3)
Signed
Date
Cylinder & Hook Pin (Ref 2)
Signed
Date
Rear lock (Ref 10)
Signed
Date
Check Valves (Ref 16)
Signed
Date
Seal Kits (Ref 15)
Signed
Date
Push Bar (Ref 8)
Signed
Date
Front lock pin kit (Ref 9)
Signed
Date
QMS 22
REV: D - JAN2012
Dromone Multi– Lock Quick Coupler
Hourly Interval
1000
2000
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
Dromone Multi– Lock Quick Coupler
15
3000
4000
INSPECT
INSPECT
INSPECT
REPLACE
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
REPLACE
INSPECT
REPLACE
INSPECT
INSPECT
INSPECT
INSPECT
5000
6000
INSPECT
REPLACE
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
REPLACE
INSPECT
REPLACE
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
INSPECT
REPLACE
INSPECT
REPLACE
INSPECT
Author:EOD
Approved:MS