Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Kontrol Jarak Jauh Daikin ALTHERMA. Daikin ALTHERMA 9 halaman. Low temperature split, eabh16da6v, eabh16da9w, eabx16da6v, eabx16da9w, eavh16s18da6v(g), eavh16s23da6v(g), eavh16s18da9w(g), eavh16s23da9w(g), eavx16s18da6v (g), eavx16s23da6v(g), eavx16s18da9w(g), eavx16s23da9w(g)
Juga untuk Daikin ALTHERMA: Panduan Cepat (4 halaman), Panduan Pengguna (5 halaman), Panduan Referensi Pengguna (20 halaman)

Daikin ALTHERMA Panduan Instalasi
3 Installation
3
Installation
3.1
Opening the units
3.1.1 To open the outdoor unit
1
Remove 1 screw from the service cover.
2
2
2
Remove the service cover.
3.2

Mounting the outdoor unit

3.2.1 To prepare the installation structure

If the unit is installed directly on the floor, prepare 4 sets of M8 or M10
anchor bolts, nuts and washers (field supply) as follows:
INFORMATION
The maximum height of the upper protruding part of the bolts
is 15 mm.
(mm)
In order to guarantee good operation of the unit in areas with risk of
snowfall, a minimum of 10 cm needs to be assured below the bottom
plate of the unit. It is recommended to construct a pedestal with the
same height as the maximum snowfall height. On this pedestal it is
then recommended to install the EKFT008CA option kit to guarantee
the minimum space of 10 cm below the bottom plate of the unit.
Installation manual
2
1x
1
b
(mm)
a Maximum snowfall height
b EKFT008CA option kit
If the unit is installed on brackets to the wall, it is advised to use the
EKFT008CA option kit and to install the unit as follows:
b
b
(mm)
a Maximum snowfall height
b EKFT008CA option kit
EVLQ05+08CAV3
Daikin Altherma hybrid heat pump – outdoor unit
4P344906-1 – 2013.02