Daikin BRC7EA631 Panduan Instalasi - Halaman 13
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Kontrol Jarak Jauh Daikin BRC7EA631. Daikin BRC7EA631 16 halaman. Wireless remote controller kit
Juga untuk Daikin BRC7EA631: Panduan Pengoperasian (20 halaman)

6. TEST OPERATION
For VRV indoor unit
• Perform test operation according to the instructions in the installation manual attached to the outdoor unit.
For Sky Air indoor unit
• Perform an indoor unit test operation. During the test run, the indoor unit cycle through various operation
modes and functions to check if they are ready for operation.
• After completing the refrigerant piping, drain piping, and electrical wiring, perform operation in accordance
with the procedure shown in table below in order to protect the unit.
Order
(1)
Completely open the stop valve on gas side.
(2)
Completely open the stop valve on liquid side.
(3)
Turn the power on at least 6 hours before operating the unit.
Set to the cooling operation using the remote controller, and then start the operation by
(4)
pressing the ON/OFF button.
Press the
(5)
the trial operation mode.
(6)
Press the
(7)
Press the
(8)
Check the functions in accordance with operation manual.
[PRECAUTIONS]
1. Refer to the installation manual attached to the outdoor unit for individual operation system types.
English
Operation description
button 2 times, and let the operation continue for 3 minutes in
TEST
button to check the actuation.
button 1 time to return to normal operation mode.
TEST
12