DS Greenhouse Blast GH450 Panduan Pemilik - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Tungku DS Greenhouse Blast GH450. DS Greenhouse Blast GH450 13 halaman. High efficiency wood or coal furnace
Outside Fire Door Option (O.F.D.)
CLOSE
NOTE: CLOSE top vent door while
loading furnace to keep smoke &
gases out of greenhouse while
loading furnace. Reopen top vent
door before closing O.F.D.
OPEN
WARNING: Top vent door must be
OPEN when O.F.D. is closed to allow
air circulation around front of furnace.
O.F.D. Flange
1" space
away from
O.F.D. frame
O.F.D. Flange
1" space
away from
O.F.D. frame
Use 18 - #14 x 3/4 self
tapping screws to attach
O.F.D. to front of furnace.
When fastening combustible
WARNING:
greenhouse wall framing to
O.F.D. flange, keep all
combustible material at
least 1" away from main
frame of O.F.D.
INSTALLATION INSTRUCTIONS:
Install O.F.D. on GH 450 Furnace. See drawing
above. Install the GH 450 Furnace with the O.F.D.
already installed, into the wall of your greenhouse.
With the GH 450 Furnace and Optional O.F.D. in
final position, frame wall of greenhouse to within 1"
of O.F.D. frame.
Keep all combustible materials 1"
away from O.F.D. frame. Approximate rough
WARNING:
opening will be 41-3/4" wide x 74-3/4" high.
8