Daintree GE Current Arize Factor Panduan Instalasi - Halaman 5

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Peralatan Pencahayaan Daintree GE Current Arize Factor. Daintree GE Current Arize Factor 10 halaman. Horticulture led lighting system

Daintree GE Current Arize Factor Panduan Instalasi
Arize
Factor
®
Rolling Rack Installation Steps
Place lightbar on GEMB-BAW2 as shown, push
1
down with screwdriver to secure on bracket
Suspended Mount Installation Steps
Wireform supports
A
Using two wireform supports (GEMB-BANE), the ML Series lightbar can suspended on a support structure (A) or on
cables as shown above (B and C).
Cross
section view
Slots
Attach wireform supports by pushing up into the slots on the
underside of the lightbar.
A) Adjust screws to level the lightbar with
2
screwdriver. B) After lightbar is leveled, tighten
the 2 screws at the bottom.
B
5
Installation Guide
A
B
C
A
B