Installation Guide for Cascading on a 150A Circuit
STEP 1:
M
ounting bracket preasseMbly
The preassembly requires the 150 A cascading kit
(AddÉnergie part number C+V1-PWCK-150) and 1
or 2 double 40 A breakers (AddÉnergie part number
breaker-40D) depending on the number of charging
stations to be mounted on the pedestal.
• Install the 2 provided terminal blocks (1 isolated
3-position terminal block for the live conductors,
and 1 non-isolated terminal block for the grounding
conductor) and the breakers onto the mounting
bracket with the provided screws.
• Connect the power supply cables from the top of
the terminal blocks to the breaker(s), depending on
the number of stations to be installed.
STEP 2
:
M
ounting bracket installation and power supply
:
cable connection
• Install the power supply cables coming from the previous
charging station and the power supply cables going to the
next one, letting 1 foot (30 cm) of cable protrude from the
conduit.
• Place the mounting bracket on the concrete base,
making sure that the anchor's threaded rods pass
through the 4 holes in the base of the bracket.
• Connect the power supply cables to the bottom of the
terminal blocks.