AddEnergie CoRe+PSV2 Panduan Instalasi - Halaman 2

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Pengisi Daya Baterai AddEnergie CoRe+PSV2. AddEnergie CoRe+PSV2 14 halaman.

IMPORTANT
Split Phase 120/240 VAC Supply or 3 phase 120/208 VAC (must be protected by a 40 A fuse or circuit breaker)
Both lines must have 120V between ground.
Voltage supply must be grounded.
Require 2 lines and 1 ground connection. Neutral is not used. (Refer to Figure 1 and Figure 2)
Maximum output power: 7.2 kW @ 240 VAC or 6.3 KW @ 208 VAC
Built-in protection against overvoltage conditions and leakage current to ground
Connect the power supply of the EVSE with caliber 6 to 8 copper conductors
Any EVSE part alteration will automatically void the warranty.
Install the Communication Gateway prior to the Commissioning of the Station
The Communication Gateway is the property of AddÉnergie. Fees will be charged if the Gateway is damaged
or lost.
IMPORTANT ELEMENTS TO CONSIDER WHEN INSTALLING THE COMMUNICATION GATEWAY:
• An Outdoor installation is recommended. The Customer must provide a waterproof PVC box and install it less
than 50 meters (164 ft.) from the stations.
• Never use a GFCI outlet to power the Communication Gateway.
Contact us when the Communication Gateway is installed to validate the signal levels and activate Commissioning
or for any other questions: 1-877- 505-2674 #203
Split Phase 120/240 VAC Supply
120VAC
Neutral
120VAC
2016 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice
Fig. 1
L1
240VAC
(N.C)
Charging
Station
L2
GND
3 phase 120/208 VAC Supply
120VAC
GND
Neutral
(N.C)
B
Fig. 2
A
208 VAC
C
GND
L1
GND
Charging
Station
L2
2