AddEnergie SmartTWO Panduan Instalasi - Halaman 15

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Pengisi Daya Baterai AddEnergie SmartTWO. AddEnergie SmartTWO 20 halaman.
Juga untuk AddEnergie SmartTWO: Panduan Memulai Cepat (4 halaman)

Electrical Connections
Remove the block cover.
Insert the wires from the bottom of the base and proceed with the connection as shown on the figure below for
each EVSE.
IMPORTANT
Installation and maintenance of this EVSE must only be
performed by a certified electrician to ensure compliance
with local and national codes.
Requires a dedicated 40A dual protection device
(breaker or fuse).
Do not add CCID protection to the service panel. This
kind of protection is already built into AddÉnergie's
EVSE.
© 2019 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice
Piédestal
Pedestal
Input: 208/240VAC nominal, 60Hz, 30A
Recommended tightening torque for the block bolts: 18 Nm.
Wire size of AWG 2 - 8, copper or aluminium
Mural
Wall-mounted
Le couvercle du bornier doit
être remis en place une fois les
connexions effectuées
Reinstall the block cover once
all connections are made.
15