Dan's Comp Top Load Stem Panduan Instalasi - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Aksesori Sepeda Dan's Comp Top Load Stem. Dan's Comp Top Load Stem 5 halaman.

Installing the Handlebars

Loosen and remove the clamping bolts holding the face plate
on the top or front of the stem.
Place the face plate back on and start threading the bolts into
the stem body.
Tighten the stem clamp bolts in a cross pattern. Be careful not
to over tighten the bolts, as you can crush the bars or strip the
threads in the stem. Loose stem bolts can also strip the bars
clamp area.
As you are tightening the bolts, the gap between the face plate
and stem body needs to be the same all of the way around.
These instructions are to be used as a guide only. Improperly installed parts may lead to severe injury or harm. We strongly recommend that
a properly trained bike mechanic handle all installations, adjustments and repairs on your bike. As always...Ride Safe!
AMain.com Inc.
Top Load Stem Installation
Apply a little grease to the threads of the bolts before threading
them back into the stem.
Place the handlebars in the stem
Use the knurling (the rough area) on the handlebars to help
center them in the stem.
1-844-970-4269
www.danscomp.com
Page 4