Anzzi Anzzi SB-AZ03CD Panduan Pemasangan & Pengoperasian - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Perlengkapan Kamar Mandi Anzzi Anzzi SB-AZ03CD. Anzzi Anzzi SB-AZ03CD 14 halaman. Shower base

Anzzi Anzzi SB-AZ03CD Panduan Pemasangan & Pengoperasian
STEP 4
Install the shower drain (NOT INCLUDED)
according to the drain installation manual
(supplied with the drain). (Fig 4)
ATTENTION
Plumber's putty will degrade base material,
causing cracks and potential property
damage. DO NOT use plumber's putty to
seal between drain and base. Use sealant
or gasket.
STEP 5
Apply a generous amount of mortar that
has been mixed to a thick consistency.
Place the base in the wet mortar, adjust
until it is level, and let mortar cure for
24 hours. Proceed to the next step. (Fig 5)
1
Fig. 4
Mortar
Fig. 5
9