Anzzi SH-AZ101 Series Panduan Pemasangan & Pengoperasian - Halaman 8

Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Perlengkapan Kamar Mandi Anzzi SH-AZ101 Series. Anzzi SH-AZ101 Series 14 halaman. Rainfall shower bar
Juga untuk Anzzi SH-AZ101 Series: Panduan Pemasangan & Pengoperasian (12 halaman)

INSTALLATION
5
[09]
nut
washer
[01]
6
rod
[11]
connector
nut
b.
PG. 4
cap
a.
[09]
c.
[01]
STEP 5:
Install the Riser [09] with washer to the
Faucet [01]. Hand tighten the nut.
STEP 6:
a. Remove the cap from the
Mounting Kit [11].
b. Install the Mounting Kit [11] to the rod
of the Riser [09] then install the
Faucet [01] and hand tighten the nuts.
c. Adjust the Mounting Kit [11] until the
screw holes of connector are aligned
vertically.
d. Make sure the Riser [09] is vertical.
e. Mark the positions of the screw holes.
f. Remove the Faucet [01] and Riser [09].