Anzzi SB-AZ009WC Panduan Pemasangan & Pengoperasian - Halaman 9

Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Produk Pipa Anzzi SB-AZ009WC. Anzzi SB-AZ009WC 14 halaman. Shower base
Juga untuk Anzzi SB-AZ009WC: Panduan Pemasangan & Perawatan (8 halaman)

Anzzi SB-AZ009WC Panduan Pemasangan & Pengoperasian
ATTENTION
The following steps are for the rectangle
shower tray.
STEP 1
Ensure that the floor and the studs are at right angles.Provide a 5"×5" opening in the subfloor
for the drain. The 2" PVC waste pipe should extend above the surface of the sub-floor according
to the drain installation instructions and the height of the Shower Tray.
Mark unit position on floor and through drain opening.
Mark the locations of the studs on the flange of the base.
These marks are used to verify base location after drain is installed. (Fig 1)
The pipe height (A) shall be determined according to the products on hand.
C
5"
(12.7 cm)
A
7