Anzzi SD-AZ8076-01CHR Panduan Pemasangan & Pengoperasian - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Produk Pipa Anzzi SD-AZ8076-01CHR. Anzzi SD-AZ8076-01CHR 16 halaman. Glass shower door

Anzzi SD-AZ8076-01CHR Panduan Pemasangan & Pengoperasian
3
1.
Place Anchor 2 of Fixed Panel Bottom Clip [11] to the marked location and mark the
screw hole on the deck. (Fig 3.1)
2.
Remove Anchor 2 and drill a 1/8" hole at the marked location if drilling into acrylic or
wood. Drill a 1/4" hole if drilling into tile material and insert the Small Anchor [14].
Only use anchor with tile.(Fig 3.2, Fig 3.3)
3.
Drill 5/16" holes at the location marked on the wall and insert the White Plastic Anchor
[05].(Fig 3.4, Fig 3.5)
4.
Place Anchor 2 of Fixed Panel Bottom Clip [11] to the marked location and secure with
Screw [13].(Fig 3.6)
5.
Carefully remove the Corner Protector from the bottom corner of Fixed Panel [01] and
apply a good quality Silicone Sealant to the bottom of it. (Fig 3.7.a)
6.
Apply a good quality Silicone Sealant between the Glass Supports [03] and the wall.
Place Fixed Panel [01] on to the deck of bath tub with Gasket 1 between the panel and
Anchor 2.(Fig 3.7)
Note: Make sure to clean the deck before placing Fixed Panel [01] on it.
7.
Secure the Glass Supports [03] with Screw [04]. Gently push the Fixed Panel [01] to
the wall. Use a level to make sureFixed Panel [01] is plumb and level. Then attach the
panel to the Glass Supports [03] with screws andAllen Key [16].(Fig 3.7)
8.
Install Clamp, Gasket 2 and Sleeve at the front of Fixed Panel [01] and secure by
tightening the Screw.(Fig 3.7)
9
3
[13]