Anzzi FT-AZ114-59 Panduan Pemasangan & Pengoperasian - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Bak mandi Anzzi FT-AZ114-59. Anzzi FT-AZ114-59 10 halaman. Freestanding bathtub
IMPORTANT
A) A freestanding bathtub is not designed to support weight on its rim. Therefore, do not
sit or stand on the bathtub's rim.
B) Please retain this manual a�er installa�on for future reference and maintenance.
C) Installa�on of tub is a two-person job.
DELIVERY OF YOUR TUB
Unpack and check for damage.
Unpack the bathtub and inspect for damage or missing parts right away. Do not wait to do this.
Damage reported a�er installa�on will not be covered by warranty. Repack the tub and keep it
safely stored un�l installa�on begins.
Protect your tub.
Before commencing installa�on, ensure the tub is wholly protected and leave the covering in
place un�l the bathroom is complete. The warranty does not cover scratches and damage
incurred during installa�on.
TESTING THE TUB
1. Place the tub on a completely flat surface where the water may drain it a�er tes�ng.
2. Close the drain and fill the tub about halfway.
3. Allow the water to stand for 30 minutes. Then inspect the drain and plumbing for any leaks.
TEST THE BATHTUB WHILE YOU HAVE ACCESS TO THE
BOTTOM AND BEFORE PERMANENT INSTALLATION.
Have questions? Call us at
or visit us at
www.ANZZI.com
5