Anzzi Stone Panduan Instalasi dan Perawatan - Halaman 2

Jelajahi secara online atau unduh pdf Panduan Instalasi dan Perawatan untuk Bak mandi Anzzi Stone. Anzzi Stone 2 halaman.

4
Place the bath on two wooden blocks over the waste
connections. Connect the waste. Fill the bath with water and
check for leaks from the waste before removing the blocks.
6
24H
5
7
2 - 2
4x
Place the wedges in position.
The wedges can now be
disposed of.