Dulce systems PRO DQ Instalasi dan Panduan Pengguna - Halaman 6
Jelajahi secara online atau unduh pdf Instalasi dan Panduan Pengguna untuk Penyimpanan Dulce systems PRO DQ. Dulce systems PRO DQ 20 halaman. Generation 2
3.3.
Front, back and adapters
Front and Rear Views
Handle
Disk Modules
1
2
Mute Button
3
Temp Alarm
4
Fan Alarm
5
Disk Modules
6
7
8
Host Bus Extender Card for desktop
Link Status:
Cable Installed
Config
Power On
Switches
4 or 8 Lane
PressCard 34 Adapter for laptop
Uplink Port x1
PRO DQ
Installation and User's Manual
g2
Handle
Ethernet Port
Uplink Port x1
Uplink Port x8
Config
Switches
Enclosure
Cooling Fan
Power Switch
Power is remotely
controlled by computer
Power Plug
Power Supply Fan
Uplink Port x8
PRO DQ
Installation and User's Manual
Installation and User's Manual
g2
4. Installation
Please follow these few steps to install the
Please follow these few steps to install the PRO DQ. This process typically takes
about 20 minutes to complete.
minutes to complete.
Overview of installation:
• Disk Module Installation
• Host Bus Extender or ExpressCard
Host Bus Extender or ExpressCard Adapter installation
• Connections of Uplink cable
• Driver Installation
• RAID Console Installation
The PRO DQ is normally
pre-formatted for Apple Mac OS X. After the driver installation step
formatted for Apple Mac OS X. After the driver installation step
formatted for Apple Mac OS X. After the driver installation step
and a reboot, the PRO DQ
use.
Windows operation will require a format/partition process. The PRO
Windows operation will require a format/partition process. The
DQ ship already pre-
simply run the Windows Disk Management utility to prepare the RAID
simply run the Windows Disk Management ut
for Windows usage.
4.1.
Disk Module Installation
Disk Module Installation
Remove the front bezel. Install each marked Disk Module into the slot indicated.
Remove the front bezel. Install each marked Disk Module into the slot indicated.
Remove the front bezel. Install each marked Disk Module into the slot indicated.
Pull the Lock Pin to the right and insert drive tray fully, release Lock Pin to
Pull the Lock Pin to the right and insert drive tray fully, release Lock Pin to
secure.
Page 11
Page 12
his process typically takes
Uplink cable to the Drive Enclosure
Installation
is normally shipped pre-configured in RAID 5 mode and
PRO DQ icon will appear on the desktop ready for
will appear on the desktop ready for
-configured in RAID 5. After the driver installation,
fter the driver installation,
ility to prepare the RAID
mode and
PRO