Duncan Enviro DD30 Panduan Pemilik - Halaman 10
Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Aksesori Traktor Duncan Enviro DD30. Duncan Enviro DD30 17 halaman. Smart ag electric drive operation
Seed Calibration
The calibration test should be done to confirm the required
seed rate to be sown and is done with the drill stationary and
level and the fan off.
Seed Calibration Procedures
1
Prepare a suitable area for weighing and setup the
scales. Tare the scales with the same container that
will be used to weight the product. Scales must be
accurate to 2 grams
2
Ensure that the metering unit is free from debris. Close
the trap-door and the bin emptying gate.
3
The metering unit should already be set. If not refer to
the pre-calibration flowchart on previous pages. Note
that it can be hard to adjust the settings once product is
in the bins.
4
Fill the appropriate bin. A minimum depth of 300mm is
required for calibration with normal seeds.
5
Undo the elbow and place the plastic container under
the metering unit of the bin to be calibrated.
6
Return to the tractor to access the SmartAG screen.
7
Go to the Bin/Tank tab as shown below.
8
Select the Bin that you want to calibrate.
9
Select Product to change if required, touch the tick to
accept.
10 Touch tick again to accept and return to the Bin/Tank
screen.
11 Touch Rate to change the Application Rate if required.
'Enviro DD30'
8
Calibration