Dunster House HANGOVER APEX G4-1824HAB Panduan Instalasi - Halaman 15
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Rumah Taman Dunster House HANGOVER APEX G4-1824HAB. Dunster House HANGOVER APEX G4-1824HAB 18 halaman. Bar 1.8m x 2.4m (6ft x 8ft)
G4 - 1824HAB HANGOVER APEX BAR 1.8m x 2.4m - Assembly Steps
Step 7: BAR
Items:
3x ST-PT3535260
3x ST-PT3535260.A
3x ST-PT3535260.38.52
1x ST-PT-PAR35701500.A
ST-PT3535260.A
ST-PT3535260.38.52
SCREW 60 mm
•
Fix the Support Bracket to the Bottom Front Panel using 2x 70mm Screws as shown in the images below.
•
Repeat this step 3 times
698
698
15
ST-PT-PAR35701500
ST-PT-PAR35701500.A
** Pre-drill parts before fixing screws **
3x ST-PT-PAR35701500
18x 60mm Screw
6x 70mm Screw
NOTE:
The layout of your doors can be changed by installing the relevant Panels
on the opposite side of your Hangover Bar.
•
Begin by placing 1x ST-PT3535260, 1x ST-PT3535260.A and 1x
ST-PT3535260.38.52 together in the same formation as shown in
the image to the left.
•
Once completed, fix 3x 60mm Screws into the areas displayed.
•
Repeat this step 2 times.
ST-PT3535260
15
Bar Top:
•
Fix 1x ST-PT-PAR35701500.A ensuring the notch clips onto the
Front Panel. Refer to the image below
•
Use 3x 60mm Screws.
•
Continue assembling the bar by fixing 3x ST-PT-PAR35701500 to
the initially fixed component.
•
Ensuring they are equally spaced.
•
Use 6x 60mm Screws
Front Panel
Notch
ST-PT-PAR35701500.A
Equally Spaced.
Equally Spaced.
Page 15