Dunster House MONKEY BARS Panduan Instalasi - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Perangkat Bermain & Peralatan Taman Bermain Dunster House MONKEY BARS. Dunster House MONKEY BARS 16 halaman. Monkey bars
Juga untuk Dunster House MONKEY BARS: Panduan Instalasi (10 halaman)
Recommendations For Play Area Surface
Recommendations
The Play System must not be installed on to hard surfaces (e.g. concrete or asphalt) or wet surfaces (where
water collects), near water or any other hazards
It is recommended that you place the Play System on a level surface at least 2 meters from any structures
or obstructions such as a fence, garage, house, overhanging branches, laundry lines or electrical wires.
It is recommended that low impact matting be installed below the Play System to reduce the possibility of
injury to users of the product.
It is recommended that you place the Play System
on a level surface at least 2 meters from any
structures or obstructions such as a fence, garage,
house, overhanging branches, laundry lines or
electrical wires.
The Play System must not be installed
on a hard surface.
It is recommended that low impact
matting be installed below the Play
System to reduce the possibility of injury
to users of the product.
The Play System must not be installed on
wet surfaces (where water collects), near
water or any other hazards.
Page 5