Casio QT-2100 Panduan Instalasi & Pemulihan Down - Halaman 7
Jelajahi secara online atau unduh pdf Panduan Instalasi & Pemulihan Down untuk Mesin Kasir Casio QT-2100. Casio QT-2100 18 halaman. Versatile intelligent terminal
Juga untuk Casio QT-2100: Panduan Servis (3 halaman), Panduan Pengguna (12 halaman), Panduan Referensi (6 halaman)
1-1-2.
From one QT-2100 to QT-2100 terminals via inline
IPL source
QT2100
IPL target
QT2100
1-1-3.
From CF card to QT-2100 terminal
QT2100
CF card
QT-2100 Installation & Down Recovery Manual
In-line
IPL Data
QT2100
1. Set up the system (refer to the left figure).
2. Initialize the target QT-2100 to receive the IPL data (refer to
the Machine initialization section of the Manager operation
chapter of QT-2100 Reference manual page 95.)
3. Execute IPL data sending operation (refer to the Auto-program
operation section of the Manager operation chapter of QT-
2100 Reference manual page 125.)
4. After IPL completion, continue to the initialize operation.
In-line (CASIO original cable or CAT5 cable)
QT2100
1. Insert the CF card to the CF card slot of the target terminal.
2. Initialize the target QT-2100 to receive the IPL data (refer to
the Machine initialization section of the Manager operation
chapter of QT-2100 Reference manual page 95.)
3. Execute IPL data receiving operation (refer to the Machine
initialization section of the Manager operation chapter of QT-
2100 Reference manual page 125.)
4. After IPL completion, continue to the initialize operation.
QT2100
I-7