Conquip ST125AF-16000 Panduan Pengguna - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Penyimpanan Conquip ST125AF-16000. Conquip ST125AF-16000 8 halaman. Coshh store

Original Working Instructions

Usage Instructions

Important Usage Notes
The COSHH Store is only designed to be lifted when empty, do not lift if it is
being used to store materials.
1000-litre, fully bunded spillage sump, ensure that no container contains
more than 1000 litres of liquid.
Only transport when empty (bund and shelves).
Check bund regularly for spills. Drain if bund has fluid in.
When loading shelves with large loads space out suitably to spread the load.
Lifting with a Forklift
1. To lift the COSHH Store with a forklift, set the machine's forks to the correct
width of the fork pockets. Make sure that they are equidistant from the
centre.
2. Drive the forklift to the COSHH Store aligning the forks with the fork pockets.
3. Move the forklift forward until the forks are fully inserted into the fork
pockets. The COSHH Store is now ready to lift.
4. Carefully raise the store just off the ground and check for balance and
security.
5. Carefully transport the store to its required destination, taking care not to
jolt.
6. When in position, the store can be lowered onto firm, level ground.
7. Reverse the forklift back and clear of the store.
Lifting with a Crane
1. Attach a suitable four leg chain sling to the four lifting points.
2. Carefully raise the store just off the ground and check for balance and
security.
3. Carefully transport the store to its required destination, taking care not to
jolt.
4. When in position, the store can be lowered on to firm, level ground.
User Guide - COSHH Store
Original Working Instructions
Usage Instructions
5. Detach the store from the lifting chains.
Usage Instructions
1. Load as required, using the shelving inside the store.
2. Ensure the doors are shut and securely locked when the store is not in use
or being supervised. It is the responsibility of the supervisor that no harmful
chemicals are removed by unauthorised users.
3. If a spillage occurs, it can safely and easily be cleaned up by removing the
mesh grating on the floor and washing down. Ensure the mesh is refitted
once cleaned.
4. To empty the bund, unlock the grating clamps and use a minimum of two
operatives to remove the grating. Place grating to one side and remove spilt
waste by pumping it out into a suitable hazardous waste bin.
5. Once all of the waste has been removed from the bund, pick up the a grating
and place back in position on top of the bund. Secure with the grating
clamps.
7