DanVex DEH-290h Panduan Pengoperasian - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Pengoperasian untuk Dehumidifier DanVex DEH-290h. DanVex DEH-290h 16 halaman.

◊ If the unit is used in dust-laden environments it is necessary to take appropriate
maintenance measures specially adapted to the particular operation conditions.
See the chapter «Maintenance and service».
◊ It is possible to increase the air circulation by locating the unit at a height about 1 meter
from the floor.
Important information on electrical connections
◊ Electric wiring of the unit should be done in accordance with DIN VDE 0100, Part 704 for
electric current supply sources equipped with automatic circuit-breakers.
◊ If the unit is installed in humid premises such as bathrooms or kitchens it should be
equipped with proper automatic circuit-breakers at the buyer's expense.
Commissioning
Prior to commissioning works or to comply with local requirements it is necessary to check air
intake openings and outlet openings to be sure that they are free from foreign matters. Intake
filters condition should be checked as well.
The following instructions are to be observed:
◊ Extension cables should be of proper cross-section.
◊ It is allowed to use extension cables if they are fully disentangled or stretched!
◊ It is not allowed to pull the unit by the power cord.
◊ Upon actuation the unit operates in fully-automatic mode till it is switched off by the
regulator
when the condensate tank is full.
◊ The condensate tank should be properly installed.
The window
should be
closed
Minimum distance = 0.5 m
Otherwise the unit will not operate!
The door
should be
closed
9
R
www.danvex.fi