Duratuf SG2520 Manual Petunjuk Perakitan - Halaman 13

Jelajahi secara online atau unduh pdf Manual Petunjuk Perakitan untuk Penyimpanan Luar Ruangan Duratuf SG2520. Duratuf SG2520 16 halaman.

ROOF ASSEMBLY CONT...
STEP 3:
 Ensure shed is sitting level and square.
 Beginning from the left hand end (looking from front) centralise the Roof sheets on the Ridge Beam.
 Ensure that the Roof is tight against the Gable Wall Sheets. Nail 1 x 40mm Weatherseal nail through the Pan into
the Ridge Beam.
 At the back left hand corner, (from front) line up the ribs on the Roof Sheet with the ribs on the Wall Sheet then
using 1 x 40mm Weatherseal nail, fix Roof Sheet through the pan into the Top Plate. Repeat at the front
STEP 4:
 Centralise the Roof at the right hand end with the Ridge Beam.
 Using 3 x Weatherseal nails, fix roof sheet to the Ridge Beam and front & back
Top Plates.
 Ensure that the Ridge Beam is straight, Nail roof sheets to ridge beam at each
overlap, through the pan using 5 x Weatherseal nails.
 Ensure the Front and Back Top Plates are straight. Nail the roof sheets to the
front & back Top Plates, using 1 x nail per pan (fig.1).
STEP 5:
 Rivet the 2 ridge flashings together using 4 rivets,
so total flashing is 2.550m long. Rivet the Ridge
Flashing to the centre of the roof using 8 x rivets
as shown (fig.2).
STEP 6:
 Place barge flashings on roof at end of shed ensuring the
diagonal trimmed end is facing out.
 Rivet the Barge Flashings to the roof and the side wall,
using four rivets on top of barge and four into the side
(fig.3).
STEP 7:
 Place spouting in position and rivet to Barge flashings at each
end and rivet to roof sheets (1 rivet per 1 sheet). Repeat with
remaining spouting.
SIDE
WALL
12
.
fig.1
fig.2
TOP PLATE
BACK
WALL
BOTTOM PLATE
SIDE
WALL
RIDGE BEAM
FRONT WALL
fig.3
X 4
Barge
X 4