Duratuf KIWI KL1 Manual Petunjuk Perakitan - Halaman 13

Jelajahi secara online atau unduh pdf Manual Petunjuk Perakitan untuk Penyimpanan Luar Ruangan Duratuf KIWI KL1. Duratuf KIWI KL1 16 halaman.

Step 1: Place shed in final position. Check the di-
agonal measurements are the same and
the shed is level before fitting Floor. It is
recommended that the shed is anchored
down with either a Duratuf Bolt Down Kit or
Duratuf Peg Down Kit depending on what
the shed is sited on.
Step 2: Lay a Floor Board on top of Bottom Plates
and Joist and push up against end wall.
Mark out where Studs are. Cut checkouts
with Electric Jigsaw so Floor Board will fit
around Studs.
Step 3: Re-position Floor Board. Lay out remaining
Floor Boards checking around Studs as
you go. The last Floor Board may have to
be cut to size.
Step 4: Nail in each Floor Board, two 50mm nails in
each end and two into Joist. Measure and
cut Floor Flashing (110) to fit in between
Door Jamb Flashings and nail in place us-
ing 50mm Clouts.
KL1 FLOOR (Optional)
13