4-noks ELIOS4YOU Pro Panduan Cepat - Halaman 2
Jelajahi secara online atau unduh pdf Panduan Cepat untuk Inverter 4-noks ELIOS4YOU Pro. 4-noks ELIOS4YOU Pro 2 halaman.
Juga untuk 4-noks ELIOS4YOU Pro: Panduan Cepat (2 halaman), Manual Instalasi dan Instruksi (17 halaman)
Mains meter
N
L3
L2
L1
Green point and the direction
of the arrow K
Elios4you Pro - LED Indicators
PV energy generation.
(red)
Higher frequency = greater generation
Wi-Fi on
(green)
Energy exchanged with the grid.
(red)
Higher frequency = greater exchange
INSTALLATION SCHEMATIC
Mains CT
(yellow label)
L towards
the main circuit breaker
Elios4you Pro - Clamps numbers
SIG + (CT L1 Production – white), red cable
1
(with white cable extention)
SIG - (CT L1 Production – white), black cable
2
(with brown cable extention)
SIG + (CT L2 Production – white), red cable
Relay
3
Normally
(with white cable extention)
Open
SIG - (CT L2 Produktion – white), black cable
4
(with brown cable extention)
SIG + (CT L3 Production – white), red cable
5
(with white cable extention)
SIG - (CT L3 Production – white), black cable
6
(with brown cable extention)
SIG + (CT L1 Mains – yellow), red cable
7
(with white cable extention)
SIG - (CT L1 Mains – yellow), black cable
8
(with brown cable extention)
SIG + (CT L2 Mains – yellow), red cable
9
(with white cable extention)
SIG - (CT L2 Mains – yellow), black cable
10
(with brown cable extention)
SIG + (CT L3 Mains – yellow), red cable
11
(with white cable extention)
SIG - (CT L3 Mains – yellow), black cable
12
(with brown cable extention)
Power supply
Missing connection
Not used
30 mm
75 mm
OPTIONAL
Main
Circuit Breaker
Generic Load
Max.10A
240VAC
GND (Alarm 2)
Do not wire
Do not wire
Input 2 (Alarm 2)
GND (Alarm 1)
Input 1 (Alarm 1)
13 14 15 16 17 18 19 20 21 22 23 24 25 26
+10 V
CTRL
GND
ID Code Label
30 mm
ID CODE:YYYYY
123456789XXXXX
75 mm
N L1 L2 L3
S
1 2 3 4 5 6 7 8 9 101112
(green)
ATTENTION: Installation must be completed by
qualified personnel only. The customer (builder,
developer or installer ) accepts all liability and
(red)
risk relating to the configuration of the product
to achieve the expected results in relation to the
specific installation. Any deficiencies in the ac-
(green)
knowledgment of the instructions may lead to
malfunctions and / or damage to the devices,
to which 4-NOKS cannot be held responsible.
Generation CT
L1 L2 L3 N
(white label)
L1 L2 L3 N
Green point and the direction
of the arrow K
L towards
the main circuit breaker
L3
L2
L1
N
ATTENTION
The responsibility of 4-NOKS in relation to the
devices manufactured is regulated by the general
terms & conditions. Be careful to ensure all
works being carried out are completed by qualified
personnel, during which, no power is being
supplied to the devices.
N
L3
L2
L1
Three-phase
Generation
(production)
ATTENTION
ATTENTION: this installation scheme is
an example.
ATTENTION
WARNING: if the generation energy LED
does not blink when the pv installation is
producing energy, it is necessary to invert all the
Generation CT (white label) orientation.
WARNING: possible alterations of CTs wires
length will cause an increase in the marginal error
during the measurements detection. We do not
recommend such alterations of the device.