4CR ECO IR 3 Panduan Pengoperasian - Halaman 6
Jelajahi secara online atau unduh pdf Panduan Pengoperasian untuk Pengering 4CR ECO IR 3. 4CR ECO IR 3 11 halaman. Infrared dryer
4. Installation
1. Installation of the substructure:
a. Remove the substructure from the packaging.
b. Place the substructure on the ground.
c. Attach the four wheels to the base and tighten the screws.
d. Make sure the rollers with brakes are mounted on the back of the substructure.
2. Installation of the column:
a. Remove the column from the packaging.
b. Place the column vertically on the base and screw it together.
c. Connect the support arm with the column.
d. Connect the lifter / damper with the column and the support arm to control the up and
down movement of the support arm.
Installation of the lamp bracket:
a. Remove the lamp bracket from the packaging.
b. Screw the lamp bracket to the support arm.
c. Connect the control cables and adjust the angle of the lamp bracket.
Further information can be found on page 2.
4