DV8 OFFROAD SPBR-05 Panduan Instalasi - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Aksesori Mobil DV8 OFFROAD SPBR-05. DV8 OFFROAD SPBR-05 12 halaman. Trailing arm skid plate

INSTALLATION
MANUAL
STEP 17 |
Secure the M10 hardware
using a #6 allen bit.
STEP 18 |
Secure the factory nut to
the control arm mounting bolt using a
24mm socket.
Torque to 159 ft-lbs.
855-680-9595
NEED HELP?