DV8 OFFROAD SPBR-05 Panduan Instalasi - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Aksesori Mobil DV8 OFFROAD SPBR-05. DV8 OFFROAD SPBR-05 12 halaman. Trailing arm skid plate

INSTALLATION
MANUAL
STEP 5 |
Ensure the bolt above the
rear drive shaft is secure, then carefully
lower the floorjack(s) allowing the gas
tank/skid to come down and swing to the
driverside slightly.
Drop it down until there is clearance
for the provided T25 tool to remove the
factory hardware.
855-680-9595
NEED HELP?