Austria Email EBH-TDW Panduan Petunjuk Pengoperasian dan Pemasangan - Halaman 6

Jelajahi secara online atau unduh pdf Panduan Petunjuk Pengoperasian dan Pemasangan untuk Pemanas Listrik Austria Email EBH-TDW. Austria Email EBH-TDW 14 halaman.
Juga untuk Austria Email EBH-TDW: Panduan Petunjuk Pengoperasian dan Pemasangan (14 halaman)

Austria Email EBH-TDW Panduan Petunjuk Pengoperasian dan Pemasangan

5.2 Assembly of Built-in Heater

In addition to the legally approved regulations, the connecting requirements of the local power company and waterworks
must be complied with.
1. Remove cover on tank.
2. Install heating flange "item 2" in boiler using sealing ring "item 3".
The sensor protection tube of the temperature control must be located above the tubular heating unit(s) when
installed (see information for installation).
3. Attach the heating flange "item 2" using flange screws M12 (max. turning moment 25 Nm ±5).
Tighten the flange screws crosswise.
The screwed connection of the heating unit must be checked and retightened using a turning moment of 2-3
Nm, if necessary.
4. Produce power connection according to the circuit diagram (see section 5.5).
Important – do not forget: connect protective conductor!
5. Mount covering cap "item 1" on tank. Put on enclosed control toggle "item 4", set desired service water tem-
perature.
6. Do not put into operation until the tank is filled with water.
The assembly of the heating installation and the initial start-up must be performed exclusively by an expert, who thereby
accepts responsibility for proper implementation and equipping.

5.3 Information on Corrosion Protection

The built-in heater is designed for installation in enamelled tanks. If the heater is installed in foreign makes, then the supplier
of the boiler must ensure sufficient corrosion protection. First control of the anode is after approx. 2 years operating time.
The protective anodes should be replaced if more than 3/4 of the material have degraded.
The following measure is required in the event of a combination with CrNi (NIRO) tanks or CrNi heat exchangers and instal-
lations in plastic-coated tanks:
a) Disconnect the guard circuit shunt resistor to ensure insulated installation of the heating unit.
b) Disconnect the anode - ground connection cable for the types with anode.
c) Replace the brass sensor tube with a stainless steel sensor tube.
Id.Nr.: 228557-15
6