4U CHECK4U 3 Manual - Halaman 10

Jelajahi secara online atau unduh pdf Manual untuk Pengontrol Akses IP 4U CHECK4U 3. 4U CHECK4U 3 17 halaman. Id checker

Connecting
the
24P cable
24 PIN Cable
put the CHECK4U 3 into the hole.
4. Open the front door of the vending machine and fasten the 4 M6Nuts.
M6 nut
5. Install the MDB Board.
10