Great Lakes GL48SR Panduan Petunjuk Instalasi - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Rak dan Dudukan Great Lakes GL48SR. Great Lakes GL48SR 12 halaman. 19" eia wall mount swing rack
Juga untuk Great Lakes GL48SR: Panduan Petunjuk Instalasi (8 halaman)

Great Lakes GL48SR Panduan Petunjuk Instalasi
UNIVERSAL
The 19" EIA Swing Frame Rack can be hinged (retractable pin) on either side.
Customer needs to determine which side is to open. To open, simply retract
8
7
both pins (top and bottom) and then open the Swing Frame Rack similar to
that of a door.
LEFT HAND SWING
CAUTION:
LEFT HAND
When installing 19" EIA equipment, make sure both retractable pins (2) are
secured into the rear section that has been mounted to the wall. Be sure
8
7
all screws, nuts, and mounting hardware are tightened before loading with
equipment.
6
6
8
D
C
B
Secure retractable pins into
A
receptacle (2 locations)
8
5
4
OR
RIGHT HAND SWING
5
7
4
7
3
RIGHT HAND
6
3
5
6
5
2
1
2
1
4
7
4
D
C
B
A