Great Lakes GL840EZ-3042S Panduan Petunjuk Instalasi - Halaman 9

Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Rak dan Dudukan Great Lakes GL840EZ-3042S. Great Lakes GL840EZ-3042S 17 halaman. Ez seismic cabinet

OPTIONAL ACCESSORIES

VERTICAL CABLE TROUGH & PDU MOUNTING
The EZ cabinet comes with a universal power strip bracket set in both
rear corners. These bracket sets will accept a wide range of Power
Distribution Units (PDUs) and will also accept Vertical Cable Troughs
(VCT-84). Brackets are vertically adjustable to accommodate different
size PDUs. Measure the required mounting distance top to bottom,
install brackets, then install power strip. 44" standard distance for GL
4
power strips; 61.250" industry standard power strips.
Tinnerman Clips
#10-32 x 1/2"
4
1.12
2.43
3.00
POWER
When using power distribution units (PDUs), each PDU should
be connected to a committed branch circuit that is rated for the
3.00
continuous load of all the equipment connected. When not using a
PDU, each piece of equipment should be connected to a dedicated
1.12
branch circuit.
3
2
B
#10-32 x 1/4"
3
2
2.74
2.74
7.56
3.86
2.74
1.64
1.64
3.00
1.37
6.19
2.74
2.74
1
8
D
D
C
C
1.12
B
B
A
A
8
1
.95
1.12
.95
.95
7
6
2.74
2.74
7.56
3.86
2.74
2.43
3.00
1.64
7
6
3.00
3.00
6.19
2.74
2.74
2.19
2.19
7.56
5
44"
STD 61.25" for
.95
optional
button
mounting
.95
1.64
5
1.37
.95
1.64
9
4
4