Great Lakes Biostar V Panduan Pengoperasian - Halaman 4

Jelajahi secara online atau unduh pdf Panduan Pengoperasian untuk Peralatan gigi Great Lakes Biostar V. Great Lakes Biostar V 16 halaman.

C
3
CODE: Three-digit code to identify heating
and pressure molding times.
(t): Heating Time: Time that material is to be
heated.
TEMP: Actual Temperature: Actual
temperature of the heating lamp. (Ts) and (T)
should be equal prior to operation.
(P): Pressure: Operating air pressure. Appears
on screen every 10 seconds. Measurement in
bar (1 bar approx. 15 psi).
A – Platform: Circular plate that is placed on
the inner lip of the pellet cup.
B
B – Pellet Cup: Container that holds dental
model, pellets, and platform for the pressure
A
forming process.
C – Clamping Frame: Secures thermal-plastic
to chamber.
Technical Data:
Voltage
Power
Work Pressure
W x D x H
Weight
Fuse
110/220 V – 50/60 Hz
Maximum 850 W
Max 6 bar/87 psi
18"x 10"x 10.25"
35 lbs./16 kg
(Two) 5x20mm 10 amp fuse