Great Lakes Case & Cabinet GL840EZ-3042 Panduan Petunjuk Instalasi - Halaman 11
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Kandang Great Lakes Case & Cabinet GL840EZ-3042. Great Lakes Case & Cabinet GL840EZ-3042 16 halaman. Ez seismic enclosure
OPTIONAL ACCESSORIES
OVERHEAD CABLE TROUGH
When ordered with the enclosure,
the overhead cable trough ships
assembled, but not installed. The
top of the EZ enclosure has a variety
of mounting holes. Place the trough
where you require cable routing.
ZeRo RMu MounTinG, ZR1 & ZR2
Both ZR bracket kits (ZR1 and ZR2) fit on the EZ enclosure. These
allow for "0" RMU mounting of 19" rack mount power strip units or other
1 or 2 RMU equipment (such as patch panels). Install the bracket onto
the rail or post toward the side panel. It is important to ensure you have
18.31" between the inner holes for 19" mounting.
1 RMU
18.31"
#10-32 x 1/2" Pan
Head Screws
2 RMU
18.31"
11