Great Little Trading Alba Narrow Toybox & Top Shelf Manual - Halaman 4

Jelajahi secara online atau unduh pdf Manual untuk Perabotan Dalam Ruangan Great Little Trading Alba Narrow Toybox & Top Shelf. Great Little Trading Alba Narrow Toybox & Top Shelf 9 halaman.

Great Little Trading Alba Narrow Toybox & Top Shelf Manual
Hardware for Step 1:
2x #2 Wooden Dowels
STEP 1:
Build the Top Shelf first.
Join panels A & B together using 2x wooden dowels #2.
NOTE: The large drill holes on the panels to be facing outwards as shown. This
will ensure they are not seen once the unit is finished.
STEP 2:
Hardware for Step 2:
Prepare the top shelf side panels by inserting 3x cam
dowels (#1) into the smaller holes of BOTH panels D & C.
6x #1 Cam dowels
#1
D
#1
#1
IMPORTANT: Make sure that the small drill holes
on the edge of panel A are next to the connection
to panel B - they will be needed at a later step.
A
#2
#2
#2
B
#1
C
#1
#1
#1
STEP 3:
Insert 2x wooden dowels (#2) into the innermost holes on BOTH edges of
panel A. These will insert into the larger holes on panels C& D.
Attach the side panels and secure using 3x cam locks (#3) on BOTH sides.
NOTE: The shaped side of the side panels
to be facing up as shown.
#3
#2
C
Hardware for Step 3:
Using Cam Locks:
4x #2 Wooden Dowels
When inserting into the panel, ensure that each cam lock's arrow is
pointing towards the drill hole on the side edge of the panel & the
dowel that it will be receiving.
6x #3 Cam Locks
When the panels are in the connected position, using a screwdriver,
turn the cam lock in a clockwise direction to lock and secure.
4
#2
#3
D
#2
#2
#3
A
#3
B
#2
#3
#3
#3