Great Little Trading L4464 Manual - Halaman 5
Jelajahi secara online atau unduh pdf Manual untuk Perabotan Dalam Ruangan Great Little Trading L4464. Great Little Trading L4464 9 halaman.
STEP 4:
Top Shelf is now ready for use.
STEP 5:
Now build the Toy Box Surround.
Attach the flat runners (#6) to the toy box side panels G & H using the flat head
screws (#5).
The position of the runners is important.
- The wheel of the runner needs to be at the front of the panels (with the flat edge)
and close to the straight edge of the panel (this is the base edge).
- Use the smaller holes when attaching the runner. Start with the first small hole
next to the wheel.
- The screws must be fully inserted and lie flat on the runner to ensure the runner
works smoothly.
When fixed in the correct position, there will be
a gap between the front edge of the panel and
the start of the runner. If the front of runner is
level with the edge of the panel, it is in the wrong
position.
#5
#1
#5
FRONT
#1
H
Then insert 4x cam dowels (#1) into the smaller
holes in the four corners of BOTH panels G & H.
5
#5
#1
#5
#5
#1
#6
G
#1
#6
#5
#1
Hardware for Step 5:
#1
8x #1 Cam dowels
BACK
6x #5 Flat Head Screws
2x #6 Flat Runners
#1