Gaggenau AI202102 Manual Petunjuk Pengoperasian dan Perakitan - Halaman 18

Jelajahi secara online atau unduh pdf Manual Petunjuk Pengoperasian dan Perakitan untuk Kap Ventilasi Gaggenau AI202102. Gaggenau AI202102 20 halaman.

Fig. 22
Fig. 23
Fig. 24
16
5. Hang the support frame with the two key-holes
to the two screws in the ceiling and attach it
with all 4 screws to the ceiling.
Circulating air mode
circulating air switch module and fix it to
support frame (Fig. 22 and 23). Cut the flexible
air pipe to the required length and fix it to the
extractor hood.
6. Remove the cover plate from the rear of the
support frame (Fig. 24).
only:
assemble the