AFFIX MADW 1220-AGR Panduan Perakitan - Halaman 10
Jelajahi secara online atau unduh pdf Panduan Perakitan untuk Desktop AFFIX MADW 1220-AGR. AFFIX MADW 1220-AGR 20 halaman. Aluminium double width mobile towers
ASSEMBLY
09
Step 7
Step 7.1
Step 7.1
Hook the Intermediate Trapdoor platform
on the 2nd Rung of the 2nd level frames.
Make sure the trapdoor is towards the
ladder side.
THIRD LEVEL
Step 8
Step 8.1
Step 8.1
Insert both the 3rd level 4 Rung Span
Frame and the 4 Rung Ladder Frame on
the respective sides into the corresponding
spigots.
For clamping instructions refer to
the Clamping Instructions section on
Page 12.