AFFIX MADW 320-AGR Panduan Perakitan - Halaman 11
Jelajahi secara online atau unduh pdf Panduan Perakitan untuk Desktop AFFIX MADW 320-AGR. AFFIX MADW 320-AGR 20 halaman. Aluminium double width mobile towers
ASSEMBLY
Step 9
Step 9.1
Step 9.1
Hook the Diagonal Brace to the 3rd Rung
of the 2nd level Span frame at one end
and the other end should be hooked to the
1st Rung of the 3rd level Ladder frame.
Step 9.2
Step 9.2
Hook the 2nd Diagonal Brace to the 3rd
Rung of the 2nd level Ladder frame at one
end and the other end should be hooked
to the 1st Rung of the 3rd level Span frame.
Step 10
Step 10.1
Step 10.1
Hook the top rung of the AGR frame to
the top rung of the 3rd level frames and
the bottom rung of the AGR frame should
be hooked to the 1st rung of the 3rd level
frames.
10