AFFIX MADW 420-AGR Panduan Perakitan - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Perakitan untuk Desktop AFFIX MADW 420-AGR. AFFIX MADW 420-AGR 20 halaman. Aluminium double width mobile towers
ASSEMBLY
07
SECOND LEVEL
Step 3
Step 3.1
Step 3.1
Insert both the 2nd level 4 Rung Span
Frame and the 4 Rung Ladder Frame on
the respective sides into the corresponding
spigots.
For clamping instructions refer to
the Clamping Instructions section on
Page 12.
Step 3.2
Step 3.2
One person should hold the frame in upright
position during this step.
Step 4
Step 4.1
Step 4.1
Hook the Diagonal Brace to the 1st Rung
of the 1st level Span frame at one end and
the other end should be hooked to the 1st
Rung of the 2nd level Ladder frame.
Step 4.2
Step 4.2
Hook the 2nd Diagonal Brace to the 1st
Rung of the 2nd level Ladder frame at one
end and the other end should be hooked
to the 1st Rung of the 1st level Span frame.
Step 4.3
Step 4.3
Level the structure using a Spirit Level on
the Rungs and the braces. Adjust using
the adjustable jack.