HiB Vapor 80 Manual - Halaman 2

Jelajahi secara online atau unduh pdf Manual untuk Perabotan Dalam Ruangan HiB Vapor 80. HiB Vapor 80 4 halaman. Cabinet

HiB Vapor 80 Manual
Installation
1. Position the cabinet in a suitable location (according to the zonal diagram on the back page
(Fig. 1) ) ensuring that the mains supply cable is within reach of the cable connection point of the
cabinet.
2. Carefully mark the desired position of the top of the cabinet on the wall using a soft pencil.
3. Remove the cabinet from the wall and using a spirit level, mark a horizontal line 40mm below the
pencil mark. Hold the mounting bracket in place with the holes corresponding with the marked
line. Ensure the bracket is central, and mark the position of the holes (Fig. A).
4. Before drilling, ensure there are no hidden cables or pipes behind the mounting points.
Drill the required holes in the marked positions. If drilling through tile, use a ceramic drill bit.
Insert the wall plugs level with the surface of the wall. If fitting to a tiled surface, wall plugs
should be inserted below the tile surface to avoid cracking. NB. For plasterboard walls, specialist
fixings should be purchased, available from any DIY or hardware store. Fix the bracket to the wall
using the screws provided.
5. Temporarily hang the cabinet on the top bracket, and position the bottom mounting bracket in
place (Fig.B). Mark the position of the bracket on the wall using a soft pencil, then remove the
cabinet from the wall.
6. Drill hole in the wall where you have marked with the soft pencil. Attach the bottom bracket to
the under side of the cabinet with the screw provided in the fixing pack.
7. Ensure the domestic electrical mains supply to which the product is being connected is
turned off. Connect the domestic mains supply according to Fig.E.
8. When the product is wired correctly, hang the cabinet on the top bracket and secure the cabinet
by fixing the bottom bracket to the wall.
9. When the cabinet is correctly fitted, adjust the shelf support brackets to your desired height
ensuring the matching brackets are level. This is done by slightly loosening the screw, do not
remove the screw completely. Once in position tighten screw to secure the bracket and put
the glass shelf into the shelf support bracket (See Fig.F).
Operations Instructions
This cabinets is controlled by a PIR sensor with a minimum activation distance of approximately 600mm
between the sensor and any solid object/surface with a delayed response time of approximently two
seconds. The cabinet will remain on until the PIR sensor is not obstructed for approximately 30 seconds.
Care Instructions
Do not use abrasives or solvents when cleaning this product. Wipe off all water spillages as soon as pos-
sible using a soft, damp cloth.
Aftercare Service
In the unlikely event that this product should fail please contact HiB customer services, contact detail
shown on the back page.
2