Celec ES-30 Panduan Instalasi Lapangan - Halaman 9

Jelajahi secara online atau unduh pdf Panduan Instalasi Lapangan untuk Pengontrol Celec ES-30. Celec ES-30 10 halaman.

Field Installation Manual
Model
Phase Configuration
Maximum Line Voltage
Maximum Power
Steps
Monitoring
Accuracy
Frequency
Protection
Equipment Protection
Circuit breaker Required
Low Losses
Human Protection
Operating temperature range
Dimensions(L X H X D)
Operating Life
Dielectric Strength
Wire Gauge & Rating
Unit Weight
______________________________________________________________________________________
ES-30

Electrical Data Sheet

ES-30
Three Phase 120/208V AC WYE/Delta
208V AC
30 kVar
6
PF, kVA, kVar, Volt, Current, KW, %THD-V
Internal Temperature & Capacitor Status
2 Kvar
60Hz
Capacitor Inbuilt Protection P2, capacitor short circuit 10,000A
Capacitor over current protection.
Internal design has adequate clearance and creepage distance
against line transients. MOVs not required.
125 Amp 3 pole
1.5 Watt each step
All High voltage shielded from contact.
o
40
C Ambient
760 x 600 x 210 mm Metal Enclosure Type 1
Switching tested up to 25,000 times, 6,000 as per UL
Tested up to 3.5 kV, 1.42 kV for 1 min. as per UL
2 AWG Str for Power, 18-22 AWG Str for CT, 8 AWG Str for Bonding
kg (
Pounds)
9